Skip to main content
PortaPro
Event and tent rentals

Running an event rental warehouse: kits, pull sheets and counting the napkins

A tent package is forty parts. A wedding is 200 napkins, 20 tables and 160 chairs. How to book the package as one line, pull it as a list, and count the small pieces back in without serializing every fork.

November 4, 20263 min read

An event rental company and a portable toilet company share trucks, routes and billing, and differ completely in the warehouse. A toilet is one unit with one number. A tent package is a top, a set of sections, legs, sidewalls, stakes and a bag of hardware, and a wedding under it is tables, chairs, linens, glassware and 200 napkins that nobody is going to serialize. The warehouse has to book the package as one thing, pull it as forty things and count the small things back in.

Serialize the assets, count the consumable-adjacent

The dividing line is whether you care which one it is. A chair gets repaired, a table gets a wobbly leg, a tent top gets a tear and a fire certificate, and when one goes missing you want to know which. Those are units, each with a number and a history. A napkin does not have a history. Glassware breaks in bulk, flatware comes back short by a dozen, and the only question is how many you have. Those are counted: a stock number, holds by quantity, and a check-in by count.

The rule that keeps this sane is per product, all or nothing. A product is tracked by unit or tracked by count, never a mix where thirty of the chairs have numbers and the rest are a pile. The mixed model gives every product two answers to "how many do I own" and they drift apart by the second event.

Kits: one line to book, forty to pull

A kit is a product made of other products: the 20x40 frame tent package is the top, the frame sections, the legs, the sidewalls, the stakes and the ratchet straps, with the counts of each. A supply like a bag of stake caps can be a part too. The customer books the kit as one line at one price. Behind that line, the system reserves the specific units for each tracked part and holds the quantity for each counted part, for the event's window.

When a part is short, the booking should still save, with the shortage marked on the line: three sidewalls short of the eight the kit needs. The office sees it, subrents, substitutes or calls the customer. A booking that refuses to save because one sidewall is out is a booking that gets taken on paper instead.

Kits nest: a dance floor kit inside a wedding package. Keep nesting shallow and refuse a loop, or the warehouse will build a kit that contains itself.

The pull sheet

The morning of a delivery, the crew needs a list: every unit by number and every counted item by quantity, for every job on the truck, in the order they load. A kit on the job expands to its parts on the sheet; a counted product shows the number to pull. As units are scanned onto the truck they tick off, and a unit that belongs on another truck says so. The sheet should be printable, because the loading dock is not a place for a phone.

Check-in: what came back, and in what state

After the event everything comes back, and the check-in is where the money is. Each unit is scanned in: clean, dirty or damaged. Each counted product is counted in: how many returned, how many damaged. Dirty units go to cleaning and are not bookable until cleaned; damaged ones go to the workshop; counted items that came back short reduce the stock and can be charged. A product that needs cleaning after every return should carry that rule, with a turnaround in days, so the chairs from Saturday are not booked for Sunday morning.

Laundry is a place, with a date

Linens go out to a laundry service and come back in a week. While they are out they are not available, and after the expected-back date they are bookable again whether or not the van has arrived. Treat the laundry as a location with a batch: what went, when it is due back, what came back clean, what came back damaged. A batch that is overdue tells you the linens for Saturday are at risk before Saturday.

Before the truck leaves

Once the pull sheet is right, the next question is whether it all fits on the truck and in what order it comes off. Load planning is that post. And for a tent, the site plan comes before any of it: layouts and site plans.

Questions this post answers

Should every chair have a serial number?

Chairs, tables and tents, yes: each is an asset you repair, retire and sometimes lose, and a unit record is how you know which one. Napkins, flatware and glassware, no: count them.

What happens when a kit is short a part?

The booking should save with the shortage visible on the line, not fail. The office sees which part is short and by how many and decides whether to subrent, substitute or call the customer.

How do counted items come back?

By count: how many returned, how many damaged. Damaged ones move to a damaged lot; the rest go to cleaning if the product needs it, and are bookable again when cleaning is done.

More on event and tent rentals.

Every event and tent rentals post
Site plans and tent layouts: drawing the event before the truck rolls

November 4, 2026 · 3 min read

A 40x60 tent with round tables and a dance floor, drawn in feet on the venue's satellite photo, approved by the customer, and handed to the crew with every corner measured. Why the drawing never changes the booking.

Read the post
Portable toilet inventory management: stay organized and avoid loss

March 18, 2026 · 3 min read

Units, consumables, the stock on each truck, and the spare parts in the shop are four inventories that fail in four different ways. A system for each that fits a small company and holds as it grows.

Read the post
Truck load planning for event deliveries: weight, volume and what comes off first

November 4, 2026 · 3 min read

Three deliveries, one box truck and a tent that has to come off last because it goes up first. How to know the truck is full before it is loaded, and how to load so the crew is not digging.

Read the post

See it on your own book.

Book a walkthrough with your own sites, units and billing cycle, or start a free trial and import your customer list tonight.

Start free trial

14-day free trial (card required, no charge today). Or a guided 30 to 60 day trial with no card.

Kygo, PortaPro's support assistant